Hotline Numbers:

+91 9289151047, +91 9811437895

Project Report on Cotton (Rui) From Waste Cotton Cloth (Code No. 1621)

Project Report on Cotton (Rui) From Waste Cotton Cloth (Code No. 1621)

35000 INR/Piece

Product Details:

X

Project Report on Cotton (Rui) From Waste Cotton Cloth (Code No. 1621) Price And Quantity

  • 35000 INR/Piece
  • 1 Piece

Project Report on Cotton (Rui) From Waste Cotton Cloth (Code No. 1621) Trade Information

  • 1 Piece Per Day
  • 2-3 Days
  • All India

Product Description

COTTON (RUI) FROM WASTE COTTON CLOTH (CODE NO. 1621)
    
The original of the cotton textile industry, the largest single industry in the country. In India, cotton has had a pride of place among cash crops from the earliest times. At present, the area under cotton crop is over 8 million hectares.Cotton can be recycled from pre-consumer (post-industrial) and post-consumer cotton waste. Pre-consumer waste comes from any excess material produced during the production of yarn, fabrics and textile products, e.g. selvage from weaving and fabric from factory cutting rooms. Post-consumer waste comes from discarded textile products, e.g. used apparel and home textiles. During the recycling process, the cotton waste is first sorted by type and color and then processed through stripping machines that first breaks the yarns and fabric into smaller pieces before pulling them apart into fiber. The mix is carded several times in order to clean and mix the fibers before they are spun into new yarns.

COST ESTIMATION

Plant Capacity                                            2400.00 Kgs/Day                  
Land & Building (1000 Sq.Mtr)               Rs.1.43 Cr
Plant & Machinery                                    Rs. 50.00 Lacs        
W.C. for 1 Month                                      Rs. 24.00 Lacs      
Total Capital Investment                          Rs.2.27 Cr            
Rate of Return                                           29% 
Break Even Point                                       53%

Note: ITI can modify the Capacity and Project Cost based on your requirement.

Contents of the Project Reports

  • Introduction
  • Uses and Applications
  • Properties
  • Market Position
  • Present Manufacturers
  • Detailed Process of Manufacture
  • Formulations
  • B.I.S. Specifications
  • Process Flow Sheet Diagram, Plant Layout,
  • Cost Economics with Profitability Analysis
  • Capacity
  • Land & Building Requirements with Rates
  • List & Details of Plant and Machinery with their Costs
  • Raw Materials Details/List and Costs
  • Power & Water Requirements
  • Labour/Staff Requirements
  • Utilities and Overheads
  • Total Capital Investment
  • Turnover
  • Cost of Production
  • Break Even Point
  • Profitability
  • Land Man Ratio
  • Suppliers of Plant & Machineries and Raw Materials
  • Cash Flow Statement
  • Repayment Schedule
  • Interest Chart
  • Depreciation Chart
  • Projected Balance Sheet for 5 Years etc.
Enter Buying Requirement Details
Email Id
Mobile number

Other Products in 'Feasibility Studies, Project Report Services' category



Account Holder Name: Industrial Technologies, India

Current Account Number: 3312 1123 908

IFSC/NEFT/RTGS Code : SBIN0001273

MICR CODE : 110002141

Bank Address: State Bank of India, Hauz Quazi, Delhi 110006, India

Back to top